No cost, no obligation

Free critical load study and a firm quote in 48 hours

DOE Order No. 202-26-37 is already in effect and Montana utilities can now shut power off proactively. The first useful step is knowing exactly what you need to keep running, and what that actually costs.

What you get

Six deliverables, no sales visit required to start

Critical load hierarchy
Your loads sorted into must-run, should-run, and can-wait, with the interruption tolerance of each one noted.
Right-sized recommendation
Generator frame size based on measured or calculated starting and running load, not on your panel's amperage.
Load-shedding scheme
A prioritized shed plan implemented in hardware, so a smaller, better-loaded unit carries what matters instead of paying for a frame you never load.
Growth headroom
Spare capacity stated in kW and percent, planned future loads modeled, and the provisions worth installing now: conduit, ATS poles, panel space.
UPS scope
Which circuits need battery bridging through the generator start-up window, and what topology they need.
Fuel and runtime plan
Fuel type, on-site storage, and expected runtime under a multi-day shutoff assumption.
Installed price range
A firm quote within 48 hours, including transfer equipment, pad, and commissioning, not equipment-only pricing.
Maintenance plan
The service cadence the equipment and its warranty require, priced with the install rather than left to you to figure out later.
Funding notes
Any REAP eligibility, financing paths, or phasing options that apply to your project.

How it works

Three steps

01

You send the basics

Facility type, rough square footage or service size, and the equipment that cannot go down. A short list is enough to start.
02

We build the study

We calculate starting and running load, sort loads by interruption tolerance, and select equipment across the five lines we carry.
03

You get the number

A sizing recommendation and installed price range within 48 hours, by email. A site visit only happens if you want one.

Start

Request your load study

The more detail you give us on peak loads and critical equipment, the tighter the recommendation. If you don't know your numbers, send what you have. That is exactly what the study is for.

We reply from Info@no-outages.com. No obligation, and no reseller list.

Free load study · 48-hour quote

Free load study

No obligation. Submissions are stored privately and used only to prepare your quote.